PROCESS & OPERATING PHILOSOPHY
Feed degassing, stripping, overhead condensation/separation and bottoms cooling. The operating sequence, recycle paths, start-up/shutdown cases and normal/turndown behavior are defined before equipment finalization.

Removal of H₂S and ammonia from refinery sour-water streams for reuse or wastewater treatment.

Feed degassing, stripping, overhead condensation/separation and bottoms cooling. The operating sequence, recycle paths, start-up/shutdown cases and normal/turndown behavior are defined before equipment finalization.
Stripper, reboiler, condenser, reflux drum, pumps, exchangers and feed tank. Materials, design margins, maintainability, isolation, access, lifting and spare philosophy are coordinated with the approved operating cases.
Feed assay/composition, design capacity, operating pressure and temperature, product specifications, turndown, utilities, battery limits and site ambient conditions.
Contaminant balance, stripping design, materials review, PFD/P&ID and emissions interfaces. The package also includes line/equipment lists, relief and utility summaries, layouts or 3D interfaces, vendor-document requirements, inspection plans and commissioning inputs as applicable.
DCS regulatory control, critical interlocks, relief and depressuring, gas/fire detection, hazardous-area classification, HAZOP actions and applicable SIS/ESD functions.
Refineries, hydrotreaters, cokers and sulfur complexes. Capacity, product quality, consumption and emissions commitments are confirmed only after the representative feed and project Design Basis are approved.
API, ASME, NACE and environmental discharge requirements. The contractual code basis is selected by destination and client specification. ASME/API/TEMA, EN/DIN and GOST/EAC requirements are not mixed without an approved code-equivalency and authority review.
API, ASME, NACE and environmental discharge requirements.