METHOD & PROCESS PRINCIPLE
Each delivery is sampled, quarantined, tested and routed by compatibility before unloading and blending.

Prevents incompatible or prohibited waste streams from entering the process.

Each delivery is sampled, quarantined, tested and routed by compatibility before unloading and blending.
Unloading station, quarantine tanks, sampling system, screens, transfer pumps, laboratory and bunded drainage.
Representative waste-oil assay including water, light fuels, viscosity, density, ash, metals, halogens, glycol, PCB screening, CCR/MCR and distillation curve.
Design Basis, material balance, PFD, P&ID, equipment and instrument datasheets, line/equipment lists, control narrative, cause-and-effect, layout/3D interfaces, inspection plan, operating and commissioning procedures.
Closed handling, relief/vent/drain routing, alarms and trips, hazardous-area classification, HAZOP actions, maintainable isolation, fire protection and emergency shutdown interfaces.
Used motor oils, hydraulic oils, industrial lubricants and approved compatible oily residues.
API storage practices, environmental waste rules, EN/DIN or GOST waste classification and local permits.
API storage practices, environmental waste rules, EN/DIN or GOST waste classification and local permits.